SB205

Industrial Stormwater Compliance Flow Chart

Does your business require a WDID, NEC or NONA to comply with California stormwater requirements?

1)           Does your business operate under any of these Standard Industrial Classification (SIC) codes or is included IGP Attachment A?

2)        Are business operations exposed to stormwater?

3)         Apply for a Waste Discharger Identification (WDID)

4)        Submit your WDID, NEC or NONA number to your city/county to complete the business license application. 

Need Stormwater Help?

Call us at (833) 420-7761 or click the button below to schedule a FREE, no-obligation assessment from a Stormwater Pro.

Useful Links

FREE CONSULTATION

Start with Stormwater Pro

SERVICES

SERVICES

  • Stormwater Pollution Prevention
  • Plans (SWPPP)
  • Level 1 and Level 2
  • Exceedence Response Actions
  • Technical Reports
  • Rain Event Action Plans (REAPs)
  • Inspections
EXPERTS

EXPERTS

  • Qualified SWPPP Developer (QSD)
  • Qualified SWPPP Practitioner (QSP)
  • Qualified Industrial Stormwater
  • Practitioner (QISP)
  • Staff Training
  • BMPs
  • Caltrans WPCM
COMPLIANCE

COMPLIANCE

  • Stormwater Evaluation
  • No Exposure Certifications (NEC)
  • Notice of Non-Applicability (NONA)
  • Construction General Permit
  • Industrial General Permit
  • Multi-Sector General Permit
  • Notice of Violation